Saco Foods retained Steven G. Ziegler for site development of a new food manufacturing and warehouse facility on four acres. The scope of services included site design, vehicular circulation, site grading plan, stormwater management, prairie restoration plan, landscape planting plan, and construction observation. The resulting landscape includes an outdoor employee garden, and a picnic and grilling area. The native prairie restoration interfaces with the adjoining Middleton Wetland Prairie Preserve and trail system at Greenway Station. The site was planned to include environmentally sensitive exterior rodent control measures.